1. Introduction And Scope
This method of statement specifies the detailed requirements and procedures for the MEP installation (PVC Conduits & Accessories Installation) of the above-mentioned project.
2. Tools And Equipment
Following are the tools you shall require for the better-quality Aluminium fabrication and cutting outcomes:
- Measuring Tape
- Tri-square
- Masking Tape
- Marker
- Calculator
3. Wearing Hand Gloves,
- Earmuffs
- Safety glasses While cutting Aluminium profiles.
- Do not wear any kind of jewelry such as rings, watches, bracelets, etc. to prevent scratching the Aluminium end products and profiles.
- Distribution and the control of material shall be monitored by the foreman and storekeeper.
4. Health, Safety, And Environment
Before commencing any work, the team shall strictly follow as per the Contractor Engr. & Procurement’s Health & Safety recommendations for handling and use of the materials. Make sure that all involved employees shall be well aware of the same.
The general health and safety guidelines are following:
- Make sure that the work area is well house kept safe, clean, and tidy.
- Make sure that all employees/workers shall adopt safe working practices at all times.
- Safety equipment PPE (Safety helmet, safety shoes, coveralls, gloves, goggles, face mask as applicable) to be worn at all times.
- Ensure sufficient lighting is available during testing.
- Report all unwanted occurrences (accidents/incidents) no matter how small to the Safety Officer on duty.
- The working site vicinity shall be well cleaned from all debris, steel waste, nails, etc.
- Toolbox talks are to be conducted before the commencement of testing works.
- Close supervision of safety requirements shall be provided.
- All necessary barriers, signage lighting, etc., are to be provided and maintained.
- All employees working on the site shall be trained in Contractor Engr. & Procurement’s PTW.
- Awareness of plant Emergency evacuation procedures.
- Inspect tools and ensure that they are free of defects.
- Ensure that appropriate tools are used for each activity.
- Ensure only Trained and Competent Workers are allowed to use power tools.
5. Procedure
a) Take profile from taping machine and place onto the Cutting machine, Check the oil level and air pressure
b) Press the START Button (Only at Start of Shift)
c) Enter required dimensions on cutter machine from cutting list/ Optimization list.
d) For the window, profiles Switch ON the laptop and choose the perspective and Cutting Dimension.
e) After entering the dimension, Press START Button to start cutting activity steps.
f) The cutting machine will automatically set the entered dimension.
g) Switch ON the Cutting Blade. (For window frames (as per your required measurements)
h) Hold Start Button to Clamp and start cutting the profile.
i) The machine will automatically Clamp the Profile
a. NEVER put your hands between the clamps.
b. Wear proper PPE such as earplugs and goggles before commencing the cutting
c. Hand gloves, safety goggles & safety shoes must be worn at all times.
j) Cutting will commence automatically.
k) Once cutting is complete, release Start Button to release the machine guard
l) Remove profile from cutting machine and store properly
m) Press the STOP Button to enter the next Dimensional Setting if you need to cut another piece.
n) Place masking tape on the profile and write Project Name & Profile cut Size.
o) Press the Stop Button at end of Shift or if no more work is required for today.
p) If off cut will not be used, transfer to waste trolley, otherwise store in the proper place.
q) While handling profile offcuts, please wear hand gloves.
![]() |
| METHOD STATEMENT FOR ALUMINIUM CUTTER MACHINE OPERATION WORK |


0 Comments